Electric Production ENERGYHDINE C.A. Works to make possible the hydro electric Projects: Hydroelectric Central Río Luis will be placed under the Zaruma and Portovelo cantons jurisdiction, in the province of El Oro; for the power production the volume of water of the Luis River will be taken advantage of and the potency to be installed will be of 15.5 Megawatts. The produced energy will be delivered to the National System and will be connected through a line of transmission of 69 Kilowatts that will arrive to the substation El Pache and the Electric Company El Oro. The execution of the hydroelectric project will generate clean energy taking advantage of the natural resources, and will relieve the national energetic deficit and will recover the energetic demand of the HOLDINGDINE S.A. companies. Nowadays, the Project is on the design phase, so it cans later (2008) proceed to the hiring for the construction of: civil works, energy transmission line, provision and assembly of the electro-mechanical equipment for the Central. Hydroelectric Central Chillo Jijón, of the Ecuadorian Army’s property, is placed in the urban neighborhood La Balvina ENERGYHDINE C.A., and pretends to generate a 400 Kilowatts force, that nowadays does not exceed the 300 kilowatts. The producing of energy will allow to cover the necessities of the Military Fort Marco Aurelio Subía. |